Projects

Construction Industry.

Professional Plumbing - Stage 2.

Carrum Downs VIC


Overview

HD Mezzanine System for Storage
Company Professional Plumbing - Stage 2
Industry Building Materials
Location Carrum Downs VIC
Features Installed

– Footings

– Staircase

– HD 10m Spans

The Problem
- PPC needed to install some additional floor space as they had run out of storage room and needed to take some of this space for a machine.

The Solution
- Heighton designed a solution that could fit over the top of the existing machinery without impacting its operation.

The Outcome
- PPC was able to claw gab valuable real-estate and use the facility's height to maximize its usage.