Professional Plumbing - Stage 2.
Carrum Downs VIC







Overview
HD Mezzanine System for StorageCompany Professional Plumbing - Stage 2
Industry Building Materials
Location Carrum Downs VIC
Date August 2021
Features Installed
– Footings
– Staircase
– HD 10m Spans
The Problem
- PPC needed to install some additional floor space as they had run out of storage room and needed to take some of this space for a machine.
The Solution
- Heighton designed a solution that could fit over the top of the existing machinery without impacting its operation.
The Outcome
- PPC was able to claw gab valuable real-estate and use the facility's height to maximize its usage.