Complete facility relocation and turnkey fit-out under a fixed lease-handover deadline. Heighton coordinated design, approvals, construction and commissioning. A purpose-built cleanroom integrated into the operational production site.
ISO 8 cleanroom delivered within Bickfords’ existing beverage manufacturing facility. Heighton designed and constructed the controlled environment with positive pressure and HEPA filtration.
Operational upgrade to support rapid growth, improve maintenance access and provide additional staff facilities. New offices, amenities, lunchroom space and a food-grade stepover walkway system around the production equipment.
Facility expansion to create additional space without sacrificing production capacity or relocating. Heighton completed a feasibility review and designed a structural mezzanine over the existing QA and washdown areas.
Consolidation of staff functions and create additional office and function space within the existing warehouse. Heighton designed and constructed a modular EPS mezzanine office system while the facility remained operational.