Printforce

Perth East, WA


Features Installed:

– Heavy duty 8 kpa mezzanine floor
– Heighton powder-coated balustrade system
– Wide span design

Art Craft Designs

VIC


Features Installed:

– First floor office system
– Staircase built over the top of the existing structural ground floor office

Bambra Press

Melbourne, VIC


Features Installed:

 

  • Heighton F11 structural heavy duty floor
  • Heighton high tensile light weight beam system
  • Heighton long span design

Ooh Media

NSW


Features Installed:

– Structural mezzanine floor system


Colourcorp

Gladesville NSW


Features Installed:

– Mezzanine floor over the top of an existing production office

Contact us to arrange a consultation or to discuss floor plans, budget costs and installation information.