Projects

Food Industry.

White Gum Apples.

Barkers Creek VIC


Overview

Heighton Mezzanine Floor
Company White Gum Apples
Industry Food
Location Barkers Creek VIC
Date March 2020
Features Installed

– Satin Black Handrails

– High Strength F11 Structural Ply Flooring

– Lightweight High Tensile Beam System

Client Testimonial
“A great job! It’s a 10”

Simon Frost
Managing Director

The Problem
- White Gum Apples required more space within their existing facility.

The Solution
- Heighton design and engineered a mezzanine floor solution to utilize vertical space above the production area.

The Outcome
- The mezzanine floor effectively doubled the usability of space and enabled a continuation of business growth within the existing facility.