Project Overview

Company: UTC Packard
Industry: Automotive
Location: Prestons, Victoria

The Problem:

UTC Packard specialises in the sourcing and supply of Electrical Wiring components globally. UTC required additional offices and cleanroom spaces within their existing warehouse space without impacting their workshop floor area.

The Solution:

Heigton designed and constructed a mezzanine office & clean room solution including interior fitout and cleanroom air handling systems to meet UTC Packards specific cleanroom requirements for production operations.

The Outcome:

UTC Packard were able to increase production within the existing warehouse facility, essentially doubling the return on building investment by utilising wasted roof space above existing production areas.

Features Installed:

  • Heighton air handling system
  • Heighton high tensile lightweight beam system
  • Heighton modular EPS build cleanroom system

Book a Free Site Visit

Fill in the form below to arrange a free, no obligation site visit at your workplace to see what the Heighton team can do for you.

 

Comments are closed.