Project Overview

Company: UTC Packard
Industry: Automotive
Location: Prestons, Victoria

The Problem:

UTC Packard specialises in the sourcing and supply of Electrical Wiring components globally. UTC required additional offices and cleanroom spaces within their existing warehouse space without impacting their workshop floor area.

The Solution:

Heigton designed and constructed a mezzanine office & clean room solution including interior fitout and cleanroom air handling systems to meet UTC Packards specific cleanroom requirements for production operations.

The Outcome:

UTC Packard were able to increase production within the existing warehouse facility, essentially doubling the return on building investment by utilising wasted roof space above existing production areas.

Features Installed:

  • Heighton air handling system
  • Heighton high tensile lightweight beam system
  • Heighton modular EPS build cleanroom system

Heighton Solutions Team

Fill in the form below to arrange our design team to visit your site or call us on 1800 276 672 to learn how we can help.

 

Comments are closed.