Project Overview

Company: Sculptform
Industry: Construction
Location: Bendigo, Victoria

The Problem:

Sculptform experienced rapid business growth as they rapidly developed new innovative architectural products, this created demand for additional office spaces within their facility.

The Solution:

Heighton designed and constructed a structural mezzanine floor and office system to maximise their existing space within the facility. By dividing the existing space into additional offices Sculptform were able to continue to expand without moving their location and manufacturing facility.

The Outcome:

Sculptform were very pleased with the result enabling all staff to be kept within the single facility and not impede on their existing production space. Heighton delivered the project with zero downtime and injuries and finished ahead of schedule.

Features Installed:

  • Heighton EPS modular build
  • Heighton acoustic windows
  • Heighton long span mezzanine beam design

Heighton Solutions Team