Projects
Health & Fitness Industry.
Proraw Gym.
Doncaster East VIC






Overview
Mezzanine FloorCompany Proraw Gym
Industry Health & Fitness
Location Doncaster East VIC
Date March 2020
Features Installed
– Galvinised Handrails
– High strength F11 Structural Ply Flooring
– Lightweight High Tensile Beam System
The Problem
- ProRaw required more space within their existing facility.
The Solution
- Heighton design and engineered a mezzanine floor solution to utilize vertical space above the production area.
The Outcome
- The mezzanine floor effectively doubled the usability of space and enabled a continuation of business growth within the existing facility.