Projects

Construction Industry.

Professional Plumbing - Stage 1.

Carrum Downs VIC


Overview

Structural Mezzanine Floor System
Company Professional Plumbing - Stage 1
Industry Building Materials
Location Carrum Downs VIC
Date September 2020
Features Installed

– Heighton Checkered Plate Staircase
– Heighton Powder Coated Balustrade System
– 5KPA Mezzanine Floor

The Problem
- Client had just purchased a new facility and needed to install per system that was going to withstand high loads for materials being moved from their existing facility.

The Solution
- Build a mezzanine floor with a plywood F11 19mm thick substrate to withstand highpoint loads and power trolleys.

The Outcome
- Client could move from their existing facility in a timely manner.