Projects
Mezzanine Floors.
Printforce.
Perth East WA







Overview
Heighton Heavy Structural Raised FloorCompany Printforce
Industry Printing
Location Perth East WA
Date September 2020
Features Installed
– Heavy Duty 8KPA Mezzanine Floor
– Heighton Powder-Coated Balustrade System
– Wide Span Design
The Problem
- Client just acquired a new property and needed to build a control room to build a new printing machine on the ground floor.
- They were running out of bulk storage and paper storage space and needed to use the floor space above the control room and print room for additional storage.
The Solution
- Build a wide span 800kg/sqm mezzanine floor within 2 weeks.
The Outcome
- Satisfied and happy client.