Project Overview

Company: Oji Fibre Solutions
Industry: Paper & Forest
Location: Brisbane, Queensland

The Problem:

Oji Fibre Solutions is a leader in producing quality kraft market pulps for use in the manufacture of various papers, boards, tissue and specialty products. OJI required additional facility space for an increase in production within their existing facility.

The Solution:

The Heighton engineering solutions team was engaged to review the facility and design a second level floor space enabling the continuation of 24 hours production schedules, whilst safely constructing a second-tier factory floor level to facilitate additional machinery, including the construction of large clean-rooms for cardboard printing operations. Heighton's project scope included; raised factory floor construction over live production operations, Ink handling and printing cleanrooms, double story office blocks, maintenance/workshop stations, and raised safety walkway platforms networks between equipment

The Outcome:

The project was successfully completed on schedule and on budget with zero injuries. Heighton exceeded client expectations and safety requirements.

Features Installed:

  • Heighton light-weight high tensile beam system to enable over live production construction
  • Heighton clean-room modular panel construct system
  • Heighton synchronised live project reporting platform to enable synergy between construction teams and Oji production schedules