Projects

Furniture.

Moderntone Furniture.

Heidelberg West VIC


Overview

Mezzanine Floor
Company Moderntone Furniture
Industry Furniture
Location Heidelberg West VIC
Date March 2020
Features Installed

– Galvinised Handrails

– High Strength F11 Structural Ply Flooring

– Lightweight High Tensile Beam System

Client Testimonial
“Very satisfying job thankyou and most professional service from start to end. Knowledgeable, efficient, well priced and courteous”

Ross Didier
Principal

The Problem
- Moderntone required more space within their existing facility.

The Solution
- Heighton design and engineered a mezzanine floor solution to utilize vertical space above the production area.

The Outcome
- The mezzanine floor effectively doubled the usability of space and enabled a continuation of business growth within the existing facility.