Projects

Construction Industry.

Mills Group.

Hallam VIC


Overview

Mezzanine Storage Solution
Company Mills Group
Industry Retail
Location Hallam VIC
Date December 2021
Features Installed

– Clear Span Design

– Swing Over Gate Access

– Matching Existing Floor Heights

Client Testimonial
The team at Heighton designed and delivered a quality product in a timeframe that was achieved and stated at the start of the job.
Nothing was an issue and would highly recommend.

Noel Pye
Operation Manager

The Problem
- The problem Mills Group had was the lack of space in their warehouse assembly area and storage space. They had an alternative design that had support posts falling in their existing office and toilet area which was impractical and they wanted an alternative design that didn’t affect their existing layout.

The Solution
- Heighton was able to design a clear span design over their existing offices with minimal posts on the ground floor that didn’t affect their existing layout. The mezzanine unlocked unused airspace that increased their storage space and floor space with freed up space on the ground floor.

The Outcome
- Mills Group ended up with additional floor space and storage space without interrupting their existing layout or having to move the facility.