Mezzanine Floor
Company George Brown Electrical
Industry Wholesale
Location Fyshwick ACT
Features Installed

– Heighton Specialised Balustrade System

– Staircase

Client Testimonial
Heighton Are a terrific Company to deal with. Would not go to another firm for construction requirements.

Matthew Hourigan
Director

The Problem
- The client had already outgrown his current facility but didn't want to move as he owns the building. Current shelving already installed on the ground floor, and stock still needed to be picked whilst carried out the installation.

The Solution
- Build a structural open span mezzanine floor system over the top of existing shelves to increase capacity so they can increase stock levels.

The Outcome
- Client was able to service more clients promptly due to the additional increase in stock.