Projects

Logistics & Supply Chain.

Fraser.

Eastern Creek, NSW


Overview


Company Fraser
Industry Logistics
Location Eastern Creek, NSW
Features
  • Heighton colour matched structure
  • Heighton sway resistant post system
  • F11 structural ply flooring
  • Heighton safety railings and safety stairway system

The Problem
Fraser required additional shelving pick face without impeding on the warehouses bulk goods storage capacity to meet the buildings targeted ROI.

The Solution
Heighton designed and constructed a structural mezzanine floor spaning close to 3000m2 within the centre of warehouse. The second level floor was used to create additional pick face area for small component storage and below level used for automation & packaging.

The Outcome
Heighton delivered the project with zero downtime and injuries and finished ahead of schedule.