Construction Industry.

Delta Group.

Melbourne VIC


Overview

Heavy-Duty Structural Mezzanine System
Company Delta Group
Industry Construction
Location Melbourne VIC
Date January 2022
Features Installed

– 25mm HD F11 Plywood Flooring

– Custom Width Slide Gate Access System

The Problem
- Delta was re-configuring their existing warehouse and needed the space where spare parts were stored as part of the expansion. This was causing some issues with looking at possibly renting offsite for the spare parts to be relocated to.

The Solution
- Heighton assessed the site and determined an area above the current office space that could be used as a possible location. Upon review, it achievable and the 600m2 floor was installed.

The Outcome
- Delta has been able to keep spare parts under the same roof as the rest of their operation. This has greatly increased their efficiency.