Project Overview

Company: CSS International
Industry: Construction
Location: Victoria

The Problem:

CSS International were facing office space constraints due to rapid business expansions. The lack of adequate office space was creating hazards within the workplace and an undesirable working environment.

The Solution:

Heighton developed a second level floor turnkey solution comprising of engineering & construction through to office interior design and fit out, effectively doubling the office space without impacting existing factory floor space, taking full advantage of the existing warehouse height, maximising return on property investment.

The Outcome:

CSS International were able to increase staff recruitment and thrive within the great working environment.

Features Installed:

  • Heighton interior design team service
  • Heighton light weight high tensile beam design
  • Heighton modular EPS panel system

Heighton Solutions Team

Fill in the form below to arrange our design team to visit your site or call us on 1800 276 672 to learn how we can help.

 

Comments are closed.