Overview
Mezzanine Raised Floor AreaCompany Colourcorp Print
Industry Printing
Location Gladesville NSW
Date March 2021
Features Installed
– Slide Gate System
– Balustrade
– Staircase
The Problem
- Colourcorp were out of bulk storage space and did not want to move because they had heavy printing machines that would cost a substantial amount to transfer. 3PL was out of the question due to needing materials at short notice.
The Solution
- Heighton built two raised platforms in areas that were not using the height above them.
The Outcome
- Colourcorp were able to maximize the internal height of the building without impeding operations. These gave them the ability to store substantially more stock.