Project Overview

Company: Bambra Press
Industry: Printing
Location: Melbourne, Victoria

The Problem:

Bambra spread its operations over various satellite facilities which increased overheads cost and negatively impacted production efficiencies.

The Solution:

Heighton designed and engineered a second level production space within Bambra's main production warehouse situated within Port Melbourne. This effectively doubled the production floor space within the facility.

The Outcome:

Bambra were able to consolidate multiple facilities into one - significantly reducing operations cost and streamlining production.

Features Installed:

  • Heighton F11 structural heavy duty floor
  • Heighton high tensile light weight beam system
  • Heighton long span design

Heighton Solutions Team

Fill in the form below to arrange our design team to visit your site or call us on 1800 276 672 to learn how we can help.

 

Comments are closed.