Turning a sandwich production facility from an empty warehouse into a high-care, high-capacity site.

2x

100%

the size of the old facility

risk owned by Heighton

With rapidly growing demand for its products, Fresh To Go Foods needed more than just a change of address; they needed a purpose-built, future-proof facility designed to support high-volume production and strict cold-chain standards.
The brief called for a full turnkey fit-out of the new site. This included temperature-controlled environments for cold and freezer storage, a streamlined sandwich assembly line, cold packing rooms, dedicated spaces for vegetable and protein handling, a decant room, general warehouse space, dual loading docks, a loadout area, and compact operational offices.
Crucially, the project was driven by a hard lease handover deadline at the Mascot facility. Delays weren’t an option. Every element – from design and compliance through to final commissioning – needed to be tightly managed on a compressed timeline.

Factory floor with workers in blue protective gowns and hairnets at assembly tables surrounded by stacking bins

A site designed for the long-run

The project was delivered on time and fully operational by the lease handover deadline, with zero disruption to Fresh To Go Foods production schedule.

The new Regent’s Park facility is double the size of the former Mascot site, providing the scale and flexibility needed to meet current demand and support future growth. Production output has increased, workflows have been optimised, and the site now operates with improved efficiency across all zones, from receiving and storage to assembly, packing, and dispatch.

Fresh To Go Foods now runs its operations from a modern, food-safe facility built to sustain high performance for the decade ahead.

Scroll to Top